Showing posts with label Cad-Q. Show all posts
Showing posts with label Cad-Q. Show all posts

Friday, March 27, 2015

Miscellaneous notes on recent events

23rd March
During the time I was communication officer at Stockholm's International Research Association (SIRAP), I got in contact with Stockholm's Academic Forum (Staf). In that regard, I was recently invited to Staf's inauguration of their new office at KTH main campus (Valhallavägen 79). This was a timely opportunity for meeting and talking to academicians from other universities around Stockholm. Staf's chairman, Moira von Wright, reported on recent developments including the initiatives for branding Stockholm as a world-class academic destination. She also announced that such efforts would thereafter be continued by the newly-born Stockholm Academic Network.

18th Mach
The workshop on BIM 360 Glue and Field was hosted by Cad-q. Joachim Dekker referred to the population increase in Stockholm as the driving force for a more accelerated construction pace. The increasing competition among current actors in the construction market and their international rivals calls for an increased use of more automated design and construction tools which are, at the time, concretized as BIM applications. BIM envisions an AECO industry with lower material and energy consumption, improved productivity and accelerated delivery. In the same fashion as previous decades since the emergence of the technology, BIM adoption level is the highest among architects and declines subsequently when it comes to engineers, contractors and owners; whereas it is the latter group who is assumed to benefit the most from BIM-implementation.

Pierre Gullander proceeded with a hands-on demonstration of Autodesk's BIM 360 products. The main objective of BIM 360 is to connect the design office to the construction site. BIM 360 Glue is intended for information exchange between the design and production units; whereas BIM 360 Field aims to coordinate the information from different production sources and sites and channel them into the hand-over documents.

BIM 360 Glue can interact with Navisworks and enables functionalities such as clash control, creating mark-ups, searching and filtering specific parameters and doing measurements in three-dimensional views. Using standard views instead of common navigation tools has proved to be easier on mouse-free tools such as tablets.

BIM 360 Field presumably facilitates tracking documents in combination with a model viewer, creating work orders and reports on issues on-the-fly during on-site inspection, assigning actor-specific tasks to work orders, automated management of inspection checklists, and monitoring overall status of the project and its progress rate. A number of early-adopters have already started using BIM 360 Field in their projects. Bravida is an example.

Rasmus Thomsen presented a brief demo of the under-development product of Autodesk, BIM 360 Layout. The idea is using a Total station for capturing the as-built model of an existing or under-construction structure and using the output for checking against the original design model and performing quality assurance and quality control procedures. However, the demo was focused on the point cloud capturing stage and did not include the comparison and QA/QC part. 

Andrew Bowles reported on the current state of implementation of BIM 360 Field in the UK. He referred to a project where using the application resulted in saving 9 hours of work per week compared with traditional methods. According to him, the implementation of the software also resulted in substantial reduction in claims from sub-contractors and other actors. This was realized by the ease of access to the required information in a consolidated and coordinated digital database. Site diaries, detailed reports and audit trail information are some examples of such types of information.

He also briefly presented projects where cloud-based information management facilitated direct transfer of building information from construction databases to the FM&O applications such as IBM Maximo. Such a cloud-based and file-import-and-export-free method is considered as the Autodesk's new paradigm for cross-disciplinary and cross-company information transfer. The vision is already realized for information transfer among Glue and Field applications. Yet, optimal work flows for benefiting such configurations and totally dismissing traditional building information registry and transfer methods need to be defined and widely implemented. 

Apparently, Autodesk is trying to add new functionalities to its software portfolio with the aim of providing a cradle-to-cradle package to design and construction firms. 

11th March
A breakfast seminar about Solibri Model-Checker for project managers was hosted by Graphisoft at their office in Solna (Sweden). Peter Dufvenberg, BIM-strategist at projektledarhuset, presented a number of cases of implementation of SMC in Stockholm. SMC is deployed for visualization, clash-control prior to and during periodical BIM coordination meetings and eventually minimizing the use of drawings. The models should, however, be visually checked before running SMC tools. In case of substantial losses of required information or inaccuracies, the model should be returned to the provider to be completed.

SMC has a specific plug-in for optimizing IFC files that are unnecessarily large. SMC also has now plug-ins for Swedish building codes such as different definitions of area calculation according to the Swedish standard, SS 21054-2009, i.e. BOA, BYA, BRA, BTA, etc. As common to all lectures on building information management, the potentials for benefiting BIM in the operations phase and relevant initiatives for this purpose such as the fi2xml format were also discussed.

4th March
In yet another lunch seminar at our department, Professor Hans Lind presented a critical view on the article 'A monstrous Hybrid’ which hypothesizes a shift from a regulated to a liberated Swedish housing market with the aim of relieving the housing shortages of the poor households. 

According to Prof. Lind, there has never happened such a phenomenon as a pure shift from a regulated to a liberated housing market. An evidence for this argument is that the rental prices in some suburbs of Stockholm such as Hanninge were market-driven already in 1970s. Apparently, forced rental reduction did by no means increase the poor household's access to the housing market in those suburbs.

In 1990, the government ceased to subsidize the interest rates for housing loans. Since then, the construction sector in Sweden has received no subsidy from the government at all; while no alternative governmental housing policy has been introduced either. This does not imply that current housing market is totally liberated; but that the real estate market policies have been left to municipalities rather than the market or the state. In such a situation, the decision-making power is distributed among local alliances - sometimes - with environmentalist agendas and the not-in-my-backyard groups and individuals. The result is often a stronger influence for those who try to reduce the costs of the municipalities.

A more concrete consequence of this trend is that the market has less influence on the pace, quality and quantity of construction; new actors can not survive in the market and established actors' strategic policies become the most influential force. The regional agents, who are expected to supervise municipalities, are quite often nominated and influenced by the municipalities themselves and are therefore neutralized. The excess of the supply of housing which adds to the bargaining power of the poor, is not realized under such circumstances.

27th February
It was May 2013 during the 19th CIB World Building Congress in Brisbane when, for the first time, I noticed that the increasingly popular concept of sustainability had been overshadowed by the notion of 'resilience' presumably in the aftermath of Hurricane Sandy and its devastating consequences for the U.S. cities.

The Coastal Resilience Seminar was organized jointly by KTH Center for a Sustainable Built Environment and City of Stockholm. Gunnar Söderholm, the head of Environment and Health Administration in the City of Stockholm, opened the session with addressing some interesting facts about Stockholm: the city was designated as the first green capital in Europe in 2010; Stockholm is growing at an accelerating pace; according to Vision 2030, by 2020, Stockholm will accommodate 250'000 new residents, will possess 140'000 new dwellings and will become a notably denser city. A sustainable urban growth will therefore gain even more importance.

Map of flooding risk in central Stockholm
The carbon dioxide equivalent emissions of the city per capita in 2015 has been estimated as 3,0 tonnes. This demonstrates a forty percent reduction since 1990. According to the vision document, Stockholm will be a fossil-fuel free city by 2040. While the requirements of ecological sustainability are not far from being met, global warming keeps to be a constant threat to the city in the meanwhile. Like many other metropolitan areas around the world, Stockholm too is now exposed to the risk of flooding. While the Hammarby Waterfront and the Royal Seaport projects were primarily marketed as sustainable urban planning initiatives, the reconstruction of Slussen has a strong focus on handling the consequences of the sea level rise. The municipality is nowadays concerned the most with the question of how to make a dense - and presumably sustainable - city also resilient.

Green islands
The next speaker was Guy Nordenson, Professor of architecture and structural engineering at Princton University. He presented a number of design alternatives for coastal resilience and climate adoption. Examples were taken from New York, Palisade Bay and Yangtze River Delta Project.

According to him, merely controlling the coastal lines using heavy engineering fortifications such as the ones erected in Saint Petersburg and Dutch cities is no more considered as a viable solution for flooding. A more plausible solution is confronting waves and hurricanes at three different zones: on the edge, inland and on the water. Constructing soft edges and allowing the water come in and managing it
inland has now gained a wider acceptance. In this approach, public spaces, landscape features, elevated roads, canals, green areas, raised houses, amphibious suburbs and areas of refuge located in high places are integrated components of an overall strategic plan for flood management. Different arrangements of elements as such are combined to serve different scenarios for hurricanes and the see level rise and the consequences are studied with the aim of identifying the best holistic design alternatives.


New Slussen: the Water Plaza
Monica Granberg, the executive director at the City of Stockholm, was the next speaker who talked about the project of reconstruction of SlussenSince inauguration of the first lock, the Queen Kristina's lock, in 1642, Slussen has been reconstructed app. every 100 years: the Christopher Polhelm's lock was built in 1755 which was replaced by the Nils Ericson's lock in 1850. The latter was in place until 1935 when the current lock, Slussen, was constructed. Existing facilities and infrastructure at Slussen are in a very bad technical condition now. Improving the structural and spatial qualities of the area is, however, not the only objective of the project.

There are many facilities, cultural sites and agricultural farms located around lake Mälaren. Flooding could therefore cause drastic consequences for more than two million people such as pollution of drinking water and economical losses. The new Slussen is designed to cope with the worst case scenario of the see level rise - which is estimated as one meter by 2100. The locks between the lake Mälaren and the Baltic Sea in the new design will increase the drainage capacity of lake Mälaren up to five times the current facilities and reduce the risk of flooding.

As the final speech of the seminar, Zahra Kalantari, the functional manager at ÅF presented some general facts about Stockholm's by-pass project, the East Link project for high-speed rail lines and the 'Blue Green Solution' initiative. The seminar was rounded up by a panel discussion moderated by Gunnar Söderholm.

Sunday, August 17, 2014

BIM-Forum


The concluding talk by Prof. Thomas Kalbro
Department of Real Estatae and Construction Management of KTH had its two-day kick-off gathering after the summer on Thursday and Friday last week. The sessions were composed of reports and group discussions on the two main themes of research and education as well as current and expected performance of the department and emerging fields in research and education. The venue was Djurönäset which is located in the far west of Stockholm's archipelago and almost at the verge of Baltic Sea. This was a timely opportunity for exchange of experience and knowledge in a relaxed environment, socializing with others at the department and breeding grounds for more collaboration and synergy in the coming year.

Division wise meeting of Project Communication; right to left:
Hannes Lindblad, Tina Karrbom Gustavsson and Prof. Väino Tarandi
The main motivation for this post is, however, presenting a delayed report on BIM-Forum organized by Cad-Q last May. The event was a thorough complement to an earlier seminar by Cad-Q elaborating on BIM 360 Glue and BIM 360 Field. The seminar was opened by a role play that simulated the building information flow through a complete reconstruction/addition process from the initial requirements management phase to operation. Participants in the demonstration represented different roles in a reconstruction/addition project e.g. the owner and the architect.

The role play simulating the building information flow
through a complete reconstruction/addition process
The point of departure was submitting a request by the owner for access to the drawings of the site and the existing facilities on the site. Currently, drawings are mostly in DWG or raster formats and deposited in digital archives of the FM firms such as HyperDocInteraxo (previously projektnavet) is Cad-Q's new web-based solution for archiving building drawings and models in more intelligent formats; while another product, BIMeye, serves as a requirements repository. BIMeye is composed of a variety of modules such as Door Manager, Room Manager, Audit Trail, etc. A useful functionality in this application - which is also available in other requirements management software such as dRofus - is creation and re-use of semi-standard room types. Customization of existing room types, classification of requirements according to different disciplines and export to popular formats such as Excel are some other functionalities of BIMeye.

The architect then opens the model in his/her BIM authoring software, in this example Revit, and uses the mass-modelling tool to create room objects based on the requirements imported from BIMeye. The newly planned or modified parts and elements of the building are modelled within Revit and exported as IFC through Naviate functionalities. Room objects and other essential parts could, in turn, be imported to MEP applications. Further disciplinary requirements such as heat transfer, glow and light intensity are then imported from BIMeye and added to corresponding building elements. Components are modified when required so as to fulfill the new requirements. The outcome is channeled back to other actors as the base for further development and the design is incrementally formed by all disciplinary actors in an iterative manner.

The BIM coordinator deploys Navite to guarantee that correct information is included in the exported IFC models. Simplebim - which operates in the background of Naviate - also controls for compliance with a host of measures such as availability of required information for energy, ingress and igress analysis, accessibility and other Swedish building codes. Similar to Solibri Model Checker, the results could be reported in a multitude of formats such as PDF, PPT and BCF (BIM Collaboration Format). The BCF file is then sent to relevant actors via email, project's repository or Naviate BCF Manager. New BCF files could be consecutively created and shared.

When the design is finalised, detailed information on new rooms such as wall and floor finishes are registered by BIMeye in the form of searchable Room Data Sheets (RDS) including intelligent fields for different parameters. BIMeye also enables synchronising RDS's with the BIM model and querying the database based on desired values for specific parameters.

In the second session, I participated in the facility management track due to my research interests. The three other tracks were for architects, structural engineers and MEP engineers. Anne Ellingbö provided a brief introduction on Interaxio and its functionalities namely archiving drawings, revision management and administrating the approval procedure. This file repository is in principle comprised of a folder structure. A specific type of folder, called "smart folder", provides some advanced possibilities such as facilitated grouping of files, batch property assignment to files, export to Excel sheets, etc.

The next speaker was Anders Moberg, manager of CAD Quality AB. He briefly presented the latest advances in implementation of BIM for facility management and the state-of-the-art of deploying new tools and technologies for propelling the sector through the consecutive stages of BIM-maturity. Moberg mentioned a number of initiatives throughout Sweden for converting legacy drawings of existing buildings to object-based models and complementing them with techniques such as laser scanning. Projects by Region Skåne, Locum, Fortifikationsverket, Riksdagsförvaltningen and Falu Kommun were among the examples mentioned by Moberg.

The final presentation was an introduction of the new version of HyperDoc. Security measures for acess of different groups of users, versioning at the object and field level, customized views to the central object-based model and the possibility for importing IFC and fi2 files were some of the new features introduced. Even though the FM&O sector has traditionally been lagging behind other actors in the building industry in embracing new information technologies, recent political ambitions and technological advances demonstrate signs of accelerating the progress in the field. Lack of universal standards and mismatch among current FM&O workflow procedures and the ones required for a BIM-based practice are two main obstacles on the way to be tackled.

Tuesday, May 6, 2014

BIM 360 Glue/Field

It was towards the end of March when I attended a seminar about Autodesk's recent flagship products, BIM 360 Glue and BIM 360 Field. This event was arranged by the Scandinavian provider of modelling and drawing software, Cad-Q, at their headquarters in Stockholm. In principle, these two product are an effort for promoting a cloud-based building information storage and management. BIM 360 Glue is in principle developed as a design tool, while BIM 360 Field will be used in the construction site.

BIM 360 Glue is aimed to be integrated to the Revit/Navisworks workflow and manage multidisciplinary model coordination, clash/conflict control and communication via web applications, tablets and smart phones. Coordination issues can be marked and reported via email. By running the software on tablets, it would be possible to benefit from the immersive capacity of the package, physically navigating around the space and measuring distances for controlling clearances. The clash detection function is however not active on tablets. BIM Glue seems to have maintained a strong focus on issue management based on specific templates for different types of issues (issues related to quality, security, constructability etc.) and a centralized web-based issue repository. Issues are attached to and handled at the object's level. BIM Glue strives to integrate the information repository, the model-checking tool and the communication environment into the design software all provided in-house at the convenience of Autodesk customers. It is possible to import and merge models in a variety of formats (dwg, dxf, ifc etc).

BIM 360 Field is actually a data management system for construction sights with in-built functionalities for commissioning and hand over. BIM Field allows importing varous types of building information from a variety of databases and applications such as MSProject. Inspection checklists and legal documents can be imported and integrated to BIM Field. Both BIM Glue and BIM Field can be synchronized with Navisworks Manage.

What seems to be still missing is an automated link for infomation transfer between Glue and Field. Apparently, information should be imported from Glue to Field (say from the design database to the construction database) almost manually. This glitch is in fact not specific to Autodesk's flagship products rather should be attributed to the fragmentation and shortsightedness still prevailing in the construction industry which is naturally also reflected in their tools, workflows and information management routines.